Bennett Electrical was appointed to deliver the complete installation, testing and commissioning of solar photovoltaic (PV) systems across four newly constructed commercial retail units at Sandy Hill Lane, Moulton.
The solar installations formed a key part of the development's sustainability strategy, helping the buildings achieve the renewable energy contribution required forSBEM (Simplified Building Energy Model)compliance underApproved Document L2 2021. Working in conjunction with the principal contractor and other site trades, the project was completed safely, efficiently and in line with the overall construction programme.
The Challenge
Bespoke Solar PV System
Each commercial unit required an individually sized solar PV system based on the SBEM design calculations. The project demanded careful coordination with ongoing construction works while maintaining high installation standards and ensuring the systems were ready for final commissioning and certification.
The Outcome
Roof Mounted Solar PV
Bennett Electrical supplied and installed complete roof-mounted solar PV systems using theK2 MiniRailmounting system, selected for its durability, reliability and suitability for the roof construction.
The installations included:
K2 MiniRail roof mounting system
Astroenergy ASTRO N7 2.0 455W and LONGi Hi-MO X10 HVB 480W high-efficiency solar panels
DC and AC cabling
AC and DC protection equipment
Testing, commissioning and certification
MCS documentation and DNO notifications where applicable
Project Statistics
4Commercial Retail Units
46 Solar Panels Installed
2 × SolaX X1-Boost-3K-G4 Inverters
2 × SolaX X3-PRO-8K-G2 Inverters
K2 MiniRail Mounting System
SBEM Compliant Renewable Energy Solution
Speak to the Experts
If you want to know more about how to enhance your life through effective electrics, get in contact with Bennett Solar today. From helping you implement energy-saving options like EV chargers and solar panels to ensuring the safety of your fusebox, we offer a range of electrical services to meet your needs.
The project was delivered on programme, enabling the development to progress towards final EPC certification while satisfying the renewable energy requirements identified during the SBEM design stage.
The completed installations now provide:
Renewable electricity generation for each commercial unit.
Reduced operational energy costs for future occupiers.
Lower carbon emissions.
Reliable, low-maintenance solar PV systems.
Fully tested and commissioned installations complete with certification and handover documentation.